If you are buying land to build townhouses, you will usually need a construction loan rather than a standard home loan.
That loan pays out in stages as the build moves forward. It does not arrive as one lump sum. Once you understand that, the rest of the process starts to make sense. This article walks through how the stages work, what you pay during the build and the tax rules investors should ask about.
How Does a Construction Loan Work When You Buy Land First?
A construction loan releases money in stages as your builder completes work, instead of paying everything upfront. The land is usually settled first, and then the build is funded step by step.
This is called a progressive drawdown. Your builder finishes a stage, such as the base or the frame, and sends an invoice. The lender then pays that amount, often after a progress inspection. Lender rules differ on how many drawdowns you get, how inspections work and what fees apply, so check these details before you commit. If you are still at the land stage, our vacant land loans page explains how that first purchase can be funded.
The trade-off is that you are borrowing against something that is not finished. Construction loans usually need more documents, such as plans and the building contract.
What Do You Pay Interest On During the Build?
During the build, you generally pay interest only on the amount drawn down so far, not on the full approved loan amount. The balance grows as each stage is paid.
This means your early repayments are smaller than later ones. Repayment options during and after the build are set by each lender, so confirm them in the loan terms.
NSW Government guidance says a borrower financing a project home must start repayments once the first progress payment is made. Check with your lender about when your repayments begin. You can test different figures with our loan repayment calculator.
A Worked Example of Drawdown Repayments
Interest during a build rises as more of the loan is drawn. This example uses an illustrative rate of 6.75% p.a., which is not an offer or a current lender rate.
Consider a first-time investor who has settled on land and has a $600,000 construction loan for two townhouses. Say $150,000 has been drawn after the base and frame stages. Interest on that amount is about $10,125 a year, or roughly $844 a month, at 6.75% p.a. Later, say $450,000 has been drawn. Interest on that is about $30,375 a year, or roughly $2,531 a month, at the same rate.
The investor expected the early months to be light on cash flow and planned for the higher figure in the later stages. They kept a buffer for the final months, when the biggest payments fall due. The outcome was that the repayments rose in line with the plan, with no surprise near completion. These figures are interest only on the drawn amount and exclude fees and any rate changes.
Ready to get started?
Book a chat with a Finance & Mortgage Broker at FinancePath today.
Understanding Progress Payments and Your Building Contract
Progress payments must match the work your builder has actually completed, and state laws limit how much deposit you can pay. These rules protect you if something goes wrong.
In Victoria, the deposit cannot be more than 5 per cent for contracts of $20,000 or more. For a contract that builds all stages, the usual schedule is 10 per cent at base, 15 per cent at frame, 35 per cent at lock-up and 25 per cent at fixing, per Consumer Affairs Victoria. Consumer Affairs Victoria also says insurance may not cover work you have paid for before it is finished. A fixed price building contract makes this schedule simpler to plan around, because you know the total before work starts. A cost plus contract is less certain, and your total can rise.
Victoria's Domestic Building Contracts Amendment Act 2025 and the Domestic Building Contracts Amendment Regulations 2026 commence on 31 March 2027. The current deposit and progress payment rules apply until then. Ask your broker and builder which rules apply to your contract date. Make sure your builder is a registered builder, and that the certificate of currency for their insurance is in hand before you pay a deposit.
How Will a Lender Assess Your Construction Loan Application?
A lender will test whether you could still afford the repayments if rates rose by 3 percentage points above the loan rate. APRA confirmed on 28 May 2026 that this buffer remains in place.
That applies to banks and other authorised deposit-taking institutions. Other income, such as overtime or bonuses, may be discounted. Where a loan is interest only, the test is run over the shorter period in which principal and interest repayments apply. That makes the test tougher than it first looks. Our borrowing capacity calculator gives you a starting point, and a broker can then match you to lenders with suitable policies.
There is also a debt-to-income limit, but finance for construction of new dwellings is exempt from it. This does not remove the serviceability test above.
Tax Points for Investors Building on Vacant Land
Land loan interest and other holding costs, such as council rates, are generally not deductible during construction. This applies until the townhouses can be lawfully occupied and are rented or available for rent. Interest on a separate construction loan is not caught by the vacant land rule and may be deductible if the general deduction rules are met. Speak to your accountant about how this applies to you.
The ATO example uses a separate land loan and construction loan. Where one loan funds both, interest must be apportioned. Non-deductible holding costs may be included in the CGT cost base. Because of this, it can help to talk with your broker about how the loans are structured before you settle.
Once a residential building is finished and rented, capital works deductions are generally 2.5 per cent a year for 40 years of the construction cost. The Australian Government states that new builds can continue to be negatively geared before and after 1 July 2027. How the new build rules apply to land bought after 12 May 2026 and built on under a separate contract should be confirmed with a tax adviser before buying. Our buying your first investment property page covers the wider planning.
Planning Your Next Step
Before you sign a land contract, ask your broker to map out the whole job: the land, the build, the drawdowns and your cash flow. It is far simpler to adjust a plan on paper than halfway through construction. See our construction loans page for more detail.
Call one of our team or book an appointment at a time that works for you. We will talk through your plans and show you the construction loan options available from lenders across Australia.
Frequently Asked Questions
How does a construction loan pay for a townhouse build?
The lender releases money in stages as your builder completes work, often after a progress inspection. You are usually charged interest only on the amount drawn so far.
Can I use interest-only repayments during construction?
Repayment options during and after the build are set by each lender, so confirm them in the loan terms.
Is interest on a vacant land loan tax deductible?
Land loan interest and other holding costs are generally not deductible while the land remains vacant, which includes until the townhouses can be lawfully occupied and are rented or available for rent. Interest on a separate construction loan may be deductible if the general rules are met. Speak to your accountant about your situation.
How much deposit can a builder ask for in Victoria?
Under the current rules, the deposit cannot be more than 5 per cent for contracts of $20,000 or more. New rules commence on 31 March 2027, so check what applies to your contract date.