Everything You Need to Know About Land Purchase Loans

How construction finance works when you're buying land to build apartments, and what first home buyers with smaller deposits need to understand.

Hero Image for Everything You Need to Know About Land Purchase Loans

What Makes Land Purchase for Apartment Construction Different

Buying land to build apartments is not the same as getting a standard home loan. Lenders treat land purchases for apartment construction as development projects, which means you'll need construction finance that accounts for the build phase, not just the land purchase. The loan structure covers both buying the land and funding the construction in stages, but approval depends on detailed building plans, council approval, and a registered builder with a fixed price building contract.

Consider a buyer who found a block in Oakleigh suitable for a small three-unit development. They needed $180,000 to secure the land, but the lender wouldn't approve the land purchase alone without seeing full council plans and a fixed price contract from a registered builder. The application stalled for six weeks until the development application was submitted and a builder provided a contract showing the total build cost. Once those documents were in place, the lender approved a land and construction package that released funds for the land first, then paid the builder in instalments as construction progressed.

This is different from a standard construction loan for a single dwelling. Apartment construction typically involves higher loan amounts, longer build times, and more complexity around approvals. Lenders want to see that the project is financially sound before they commit.

How Construction Finance Pays for the Land and the Build

A construction to permanent loan works in two distinct phases. The lender provides the funds to purchase the land upfront, then releases additional funds during construction according to a progress payment schedule. You only pay interest on the amount drawn down, which means during the early stages of the build, your repayments are lower because only part of the loan has been released.

Once the land settles, construction must commence within a set period from the Disclosure Date, usually six to twelve months depending on the lender. If building doesn't start within that window, the lender may require a new valuation or reassess the loan. During construction, the builder submits claims at agreed stages such as slab down, frame up, lock-up, fixing, and practical completion. The lender arranges a progress inspection before releasing each payment, and charges a Progressive Drawing Fee for each inspection, typically between $300 and $500 per drawdown.

In our experience, buyers underestimate how long council approval takes. For apartment developments, even small ones, approval can stretch beyond six months in some Melbourne councils. If you settle on the land before your plans are approved, you're paying interest on the land component while waiting to start construction, which can add thousands to your costs.

Ready to get started?

Book a chat with a Finance & Mortgage Broker at FinancePath today.

Fixed Price Contracts and Why Lenders Require Them

Lenders will not approve construction finance for apartment projects without a fixed price building contract from a registered builder. This protects both you and the lender by locking in the total build cost, so there's no risk of the project running over budget halfway through. A cost plus contract, where the builder charges for materials and labour as the project progresses, is not acceptable for most residential construction loans.

The fixed price contract also determines the progress payment schedule. The builder and lender agree on how much will be released at each stage, and the contract must specify what work is included in each progress payment. If the builder requests payment before completing the agreed stage, the lender's progress inspection will flag it and the drawdown won't proceed until the work is finished.

For first home buyers with smaller deposits, this is important because any cost blowout can leave you without enough funds to complete the build. A fixed price contract removes that risk, assuming the builder remains solvent. Most lenders also require builders to have appropriate insurance, including home warranty insurance, before they'll approve the loan.

What Deposit Size You'll Need for Land and Construction

Lenders typically require a larger deposit for construction finance than for purchasing an established home. While a low deposit loan might be available for a standard property purchase with as little as 5% under the Home Guarantee Scheme, construction finance for apartment development usually requires at least 20% deposit, sometimes more depending on the lender and the scale of the project.

The deposit is calculated on the total project cost, which includes the land price, the build cost, and any additional costs like council fees, consultant fees, and interest during construction. Lenders assess your ability to service the loan based on the full loan amount, even though you'll only be paying interest on the drawn-down portion during the build.

Some lenders offer access to Construction Loan options from banks and lenders across Australia, but eligibility for smaller deposits depends on whether the project is considered residential or commercial in nature. A three-unit development where you plan to live in one unit may qualify for more flexible lending than a purely investment-driven project.

Interest During Construction and How Repayments Work

During the construction phase, most lenders offer interest-only repayment options. You only pay interest on the amount that's been drawn down, which starts with the land purchase and increases as each progress payment is released to the builder. Once construction is complete and you've received practical completion, the loan converts to a standard principal and interest home loan, unless you've arranged to keep it interest-only.

The construction loan interest rate is often slightly higher than a standard variable rate, and is usually variable rather than fixed during the build. This is because the loan amount changes as funds are progressively drawn down, and lenders don't want to lock in a fixed rate on a loan that's still increasing.

Interest during construction can add up quickly, especially if the build takes longer than expected. If you budgeted for a six-month build but the project takes twelve months due to delays with materials or trades, the extra six months of interest can exceed $10,000 depending on your loan amount. Some buyers capitalise this interest, meaning it's added to the loan balance rather than paid out of pocket, but this increases the total amount you owe once the build is finished.

Council Approval and Why It Holds Up Most Applications

The single biggest delay in construction finance applications is waiting for council approval. Lenders will not release funds for the land purchase until they've seen evidence that your development application has been submitted, and in many cases they want to see approval granted before settlement. For apartment construction, council approval involves more scrutiny than a single dwelling because of planning overlays, neighbourhood character provisions, and potential objections from nearby residents.

In areas like Glen Waverley or Mount Waverley, where apartment developments are common, councils still take several months to process applications. If your development requires a planning permit rather than just a building permit, expect the timeline to stretch further. Buyers often lock in a land purchase without realising their finance is conditional on council plans being approved, and if the approval is delayed or rejected, the contract can fall through.

Working with a broker who understands development finance means the application is structured with realistic timelines, and the lender is kept informed if council approval is delayed. Some lenders are more flexible than others about settling on land before full approval is in place, but you'll pay interest on the land while you wait.

Who Can Help You Structure the Right Loan

Construction finance for apartment development is not something most buyers arrange on their own. The application involves multiple moving parts including the land contract, building contract, council plans, progress payment finance schedules, and lender-specific requirements around inspections and drawdowns. A broker who works regularly with construction loans can identify lenders that suit your deposit size, the scale of your project, and your plans for the finished units.

If you're planning to live in one of the units and rent out the others, the loan structure might involve both owner-occupied and investment components. If you're buying with a partner or family member, the loan needs to account for how ownership and repayments are split. If you're a first home buyer using a guarantor loan or accessing a government scheme, not all lenders will allow that for construction finance, so the application needs to be directed to lenders who do.

Call one of our team or book an appointment at a time that works for you. We'll walk through the costs, the timeline, and the lender options that fit your situation, so you can move forward with confidence that the finance will support the build from start to finish.

Frequently Asked Questions

Can I buy land to build apartments with a small deposit?

Most lenders require at least 20% deposit for construction finance involving apartment development, which is higher than standard home loans. The deposit is calculated on the total project cost including land, build, and associated fees.

What is a construction to permanent loan?

A construction to permanent loan covers both the land purchase and the construction in stages. You only pay interest on the amount drawn down during the build, and the loan converts to a standard home loan once construction is complete.

Why do lenders require a fixed price building contract?

Lenders require a fixed price contract from a registered builder to lock in the total build cost and protect against budget blowouts. This ensures the project can be completed with the approved loan amount.

How long does council approval take for apartment construction?

Council approval for apartment developments typically takes several months, sometimes longer if a planning permit is required. Delays in approval can push out settlement and increase interest costs on the land.

Do I pay interest during construction?

Yes, you pay interest only on the amount drawn down during construction, starting with the land purchase and increasing with each progress payment. Once the build is complete, the loan converts to principal and interest repayments.


Ready to get started?